How Long Does It Take to Build a Deck? What to Expect from Your Jacksonville Contractor
One of the most common questions we hear from Jacksonville homeowners is:
“How long will it take to build my deck?”
It’s a smart question, especially if you’re planning a backyard renovation, an upcoming event, or simply trying to enjoy the warm Florida weather before the next storm season arrives.
Stop Dreaming.
Start Building Today!
The truth is, deck timelines can vary depending on a few key factors: design complexity, permitting, material availability, and your contractor’s schedule. But with the right team and a clear plan, the entire process from initial consult to final inspection can be smoother (and faster) than most people expect.
Here’s what you can expect when working with a local Jacksonville contractor like Coastal Outdoor Construction, and why planning early puts you ahead of the curve.
From First Call to Final Nail: The Typical Timeline
Most standard deck projects take anywhere from 1 to 3 months from start to finish. But that doesn’t mean your deck is under construction for all those weeks. Much of that time involves planning, approvals, and material delivery.
Here’s a general breakdown of how it unfolds:
1. Initial Consultation & Estimate (1–3 Days)
It starts with a quick conversation. We’ll schedule an in-person visit or virtual consultation to review your space, goals, and budget. Within a couple of days, you’ll receive a detailed estimate and, if requested, a 3D rendering of your deck design.
2. Design Finalization & Material Selection (3–5 Days)
Once you approve the proposal, we work with you to finalize the layout details and select materials, including wood, composite, railing systems, and lighting. We often recommend Trex or MoistureShield for composite builds, or Severe Weather pressure-treated pinefor budget-friendly wood decks.
3. Permitting & HOA Approvals (25-30 Days)
In Jacksonville, the initial review for a residential building permit—such as a deck—typically takes 25–30 business days due to high submission volumes. This is an estimate and may change based on project complexity and any requests for additional information. The city is also working to shorten turnaround times through process improvements, including its new Express Lane Permitting initiative
4. Material Ordering & Delivery (3–7 Days)
We work directly with suppliers to get your materials ordered quickly. Off-season builds typically result in faster delivery, while peak months may incur slight delays for high-demand items or custom colors.
5. Construction Phase (3–10 Days)
Once permits are approved and materials are on site, the actual construction begins. Most builds take 3 to 10 working days, depending on:
- Deck size and height
- Multi-level or custom features
- Add-ons like pergolas, stairs, or lighting
- Weather conditions
Our licensed and insured crews work efficiently and cleanly, with minimal disruption to your home or yard. You’ll know exactly what to expect and when.
What Can Delay a Deck Project?
Even with an experienced contractor, a few factors can impact the timeline:
- Weather delays: Rain and storms can slow down construction. We plan proactively, especially during Florida’s wet season.
- Permit processing: Some counties or HOA boards take longer than others. We streamline this as much as possible, but it’s a step no one can skip.
- Custom material orders: Special decking colors, railing styles, or lighting packages may require a longer lead time.
- Scope changes: If you decide mid-project to add a pergola, expand the footprint, or upgrade materials, we’ll adjust the timeline accordingly.
That’s why it’s smart to start early, before spring and summer rushes begin.
Why Coastal Outdoor Construction Builds Faster (and Smarter)
We’ve been building decks in Northeast Floridasince 2013. That means we know how to navigate local permitting, source high-quality materials, and coordinate every phase with precision and efficiency.
What sets us apart:
- Local permitting knowledge for Duval, St. Johns, Nassau, and Clay Counties
- In-house project management so you’re never passed off to subcontractors
- Efficient, well-trained crews who respect your time and property
- 3D design previews so you’re never guessing what your deck will look like
- Free demolition of your existing deck or patio, which can save you days at the start
If you’re trying to hit a deadline, whether it’s a backyard wedding, a Fourth of July cookout, or just the start of warm-weather season, we’ll help you plan it right and get it done on time.
So, How Soon Can You Start?
If you’re thinking about building a new deck, the smartest time to start the process is now.
Even if you don’t need your deck for another couple of months, getting on the schedule early gives you the best:
- Timeline options
- Material availability
- Pricing flexibility
- Permitting turnaround
We’re already booking into next season, and the best dates fill up quickly.
Let’s Build Your Deck on Time and Built to Last
At Coastal Outdoor Construction, we don’t just build decks. We deliver peace of mind. Our team helps you plan every detail, stay ahead of delays, and enjoy your finished space with confidence.
We offer:
- Free in-home or virtual estimates
- Certified, licensed, and insured contractors
- 3D design services
- Financing options and up to $250 off installation
- Warranties up to 50 years, depending on materials
Get your free estimate nowand let’s start designing the deck you’ve been waiting for without the wait.
FAQs
Most decks take between 2 to 6 weeks from first consultation to final inspection, depending on permitting, materials, and weather. The actual build phase usually takes 3 to 10 days.
Yes. Most Florida counties, including Duval and St. Johns, require permits for new deck construction. At Coastal Outdoor Construction, we handle all permitting and inspection coordination on your behalf.
Late fall through early spring is ideal. Permits move faster, material demand is lower, and you beat the busy summer season. Starting early also gives you more flexibility on design and scheduling.
Common delays include weather interruptions, long material lead times, HOA approval wait times, or changes in project scope. Hiring an experienced local contractor can help minimize most of these.
Yes. We regularly help clients meet tight deadlines, whether it’s for an event or a seasonal goal. Please let us know your timeline, and we’ll create a plan to make it happen.